cross and icthous logo The Parish Church of St. Luke, Winnipeg
 

Home
Virtual Tour
Weddings
Weekly Schedule
Officers, staff
St. Luke, the person
Links
Contact us

Announcements
Current notices
Coming Soon
Parish Calendar

The Buildings
Heritage designation
Accessibility
The Church Bells

Music & Art
The Organ, photos
The Organ, specs
Choir CD
Art Gallery

Outreach
Hospitality
Scanterbury
HIV/AIDS orphans
Haiti Orphans
Other Projects

What’s New
In the parish
on the website


Big Changes Underway...

St. Luke’s has a long range plan to make the entire building accessible to anyone.   Presently there is an ageing wooden outdoor ramp to the church entrance, but inside, until now, there has been no way – without negotiating various flights of stairs – for people to move from the body of the church up into the chancel, or to Church House (the parish hall), or to the lower level meeting rooms.

The first stage of the plan has now been constructed: a proscenium, or extended stage, which has many uses, and a ramp which allows access to the chancel level.   Now, because of the ramp, anyone who so desires can receive Holy Communion at the high altar, or attend the smaller services which are usually held in the chancel, or meet with the Rector in his study.

The next stage is finally underway.  An elevator is being built to give wheelchair access to all levels of the church complex.  The accessibility plan, long in preparation, now becomes a reality.  Work will continue throughout the summer and well into September of 2007.  However, because the entire structure is being set outside the current buildings (see artist’s impression, first image below), interior movement should not be affected.

The pictures below tell the story.  They are being updated as work proceeds (see most recent).
artist's concept of elevator
An artist’s conception of the finished elevator
image of church wall before construction
Elevator location before work started, 7 May, 2007
a contractor's trailer at worksite
1 June, 2007
A contractor’s office trailer appears;
marks are made and measurements taken
a contractor's sign and fencing at worksite
12 June, 2007
Chain link fencing is up, and a covered passageway has been constructed leading to the church’s side door.
marks on the pavement beside church wall
12 June, 2007
The white marks indicate where
drilling is to begin
power shovel excavating
21 June, 2007
The power shovel at work
 
crowded and active worksite
21 June, 2007
Digging in progress
pilings about to be installed
walkway to north entrance
21 June, 2007
The covered walkway (arrow)
leading to the north door
concrete boom
 
A concrete conveyor
arches over Church House
concrete forms in ground
28 June, 2007
Concrete wall forms are set in the
excavated elevator site
workers on concrete forms
 
Steadying the concrete boom
over the wall forms
foundation walls done
5 July, 2007
Foundation walls
finished, and insulated
rebar installed
5 July, 2007
Workers put reinforcing bars in place,
ready for the concrete floor to be poured
view of the drain and pump system
5 July, 2007
Drainage and sump pump systems in place
 
rebar installed
12 July, 2007
Framing for the above-ground portion
being assembled

Continued next page